Project Description
Project will reconfigure the existing signalized intersection at Warwick Boulevard and Oriana Road by eliminating the east/west through movement. Pedestrian pushbuttons will be installed as part of the project.
Project Manager
Jennifer Butler
(757) 926-1582
butlerja@nnva.gov
Inspector