Project Description
Location: Nicewood AreaProject: Alleviate flooding at the intersection of Malden Lane and Maryle Court during significant rain events. A recent storm sewer model identifies that the existing system is inadequate and confirms that flooding occurs.Performance/Outcome: Reduce risk of flooding and damages; the new drainage systems will be designed to meet present Stormwater Management Standards. Approximately 70 homes and approximately 2200 LF of roadway will benefit from the installation of the stormwater drainage system.
Project Manager
Hai Tran
757.926.8264
tranhn@nnva.gov
Inspector