Project Description
The City determined that Pump Station 54 should be replaced rather than repaired. Therefore, a consulting firm has been selected to conduct a Preliminary Engineering Study, which will serve as the basis of design for pump station replacement. Location: 91 Linda Drive
Project Manager
Landon Kee
Inspector